S SRACO Web Preliminary estimate
Preliminary Estimate

Sitemap & Estimate

SRACO Group corporate website — compiled from the client brief. Each page is a vertical column, sections stack inside with hours on every tile, sub-pages branch downward. Bilingual (English + Arabic-first / RTL) and all breakpoints are included as dedicated scope blocks.

TBC needs clarification P2 phase 2 SEP separate work block
Scroll or drag to see all pages

Estimate

LineMinMax

Preliminary figure — the final estimate is confirmed once the website sitemap and wireframes are approved.

Comments & unplanned work — design iterations after each delivery. Two revision rounds per stage are included; further rounds are billed hourly at the same rate.

Management & communication — project management, calls, and coordination with SRACO's marketing, content owners and ITC.

Timeline — design phase

Phase 1 1.5–2 weeks
Discovery + Wireframes
Structure of every key template — desktop + mobile, EN + AR — approved before visual design starts.
Phase 2 3–4 weeks
Visual Design
Three concepts → the key templates → every page, desktop and mobile.
Parallel alongside
Company pages ×5 · RTL
The five company pages and the Arabic-first / RTL mirror run in parallel over approved layouts — paced by your content and approvals.
Total 6–8 weeks
Design phase
End to end — with parallel streams and timely content from SRACO's side.

Preliminary timeline — the design phase completes in approximately 6–8 weeks with timely content delivery and consolidated feedback from your side. Late content, extended review cycles, or added scope (e.g. a 6th company or a new concept direction) shift the timeline accordingly. Front-end build, CMS and integrations (Part 2) are scoped and timed separately.

Stages

Stage 1 100% prepaid
Concept
Three design concepts (hero + 1–2 sections each) + a teaser of the main animation. Paid 100% upfront before start.
Stage 2 prepay → deliver
Design — Part 1
Homepage, the hero animation and the first batch of layouts (desktop → mobile). Prepay, then deliver.
Stage 3 prepay → deliver
Design — Part 2
Divisions, company pages and the Projects Portfolio. Prepay, then deliver.
Stage 4 prepay → deliver
Design — Part 3
Remaining pages, Arabic-first / RTL pass and micro-animations. Prepay, then deliver.
Stage 5 final payment
Acceptance
Review, sign-off and final payment.
Preliminary estimate — design + animation only. Hours cover both languages (English + Arabic-first / RTL) and all breakpoints (desktop, tablet, mobile). The min–max range depends on the complexity of each block / section and is finalised after the page and block structure is approved. The 6–8 week timeline is the design phase only and assumes timely content and consolidated feedback from SRACO's side. Front-end build, CMS, ERP / CRM integrations, hosting, security and VAPT are out of design scope and handled with SRACO ITC (shown for context, not included in the figure). Video generation is not included — third-party generation / render services may be billed separately, with the amount known after the concept.